The PP10 CCPP is the largest combined cycle plant in the Middle East. WETICO’s scope of work was to design and build a Water Treatment Plant utilizing TSE Feed-water so that it can be transformed to Ultra-Pure Water for steam generation.
WETICO is market leader in providing WTP’s for Power Plant Projects and has the longest reference list in KSA.
TECHNICAL INFORMATION
Treatment System
1. Media Filtration
2. Ultra-Filtration
3. Reverse Osmosis
4. Ion Exchange mixed beds
5. Re-mineralization system
6. Neutralization systems.
Capacity
5,760 m3/day Demin water
Scope
Design, procurement, fabrication, supervision of installation, commissioning & start-up.