RO 3 currently suppliers 25% of the drinking water to Jeddah. With a capacity of 240,000m3/day it is the largest SWRO Plant in the Middle East.
The plant consists of 2 Streams; the Capacity of each stream is 120,000.00 m3 /day and comprises a Calcium Hypochlorite Dosing
System to disinfect the Product Water prior to transfer to the Jeddah City Storage and Distribution center (9 km away from the plant)
where the product Water is re- mineralized to meet WHO standards for Potable Water prior
to distribution.
The Seawater Intake, Electro-chlorination System, Waste Water Treatment, and Firewater System are common to both streams Toyobo HFF Membranes are utilized in the 1st Pass, total of 7,232 membranes housed in 3,616 Vessels, whilst 5,932 Toray Spiral Wound
membranes housed in 848 RO Vessels are utilized in the 2nd pass.
RO Reject water, being environmentally safe, is discharged to the sea via a sea water outfall whereas the dirty backwash water from the gravity filter is collected in a concrete tank and further treated for reuse.
A Neutralization system ensures that acidic streams are neutralized prior to discharge whilst an industrial Wastewater treatment plant ensures that industrial wastes are treated and passivated prior to disposal.
TECHNICAL INFORMATION
Treatment System
Electro-chlorination System, Chemical Preparation and Dosing Systems, Gravity Filters, Micron Filters, SWRO Racks and BWRO Racks, and Calcium Hypochlorite Dosing System.
Capacity
240,000.00 m3/day
Scope
Design, procurement, fabrication, installation, commissioning, and start-up