The CPP3 project is the single largest investment in history of ALMARAI ‘’The Central Processing Plant is considered the heart of Almarai’s operations’’.
WETICO’s scope of work was to design and build a Sewage Treatment Plant (STP).
This plant treats the wastewater of people accommodations, so that it can be transformed to filtered Water for Production, cleaning, and other purposes.
TECHNICAL INFORMATION
Treatment System
1. MBR systems
2. Aeration systems
3. Chemical systems
4. SCADA systems
5. Mechanical screens systems
6. Sludge drying beds.
Capacity
2×250 M3/day
Scope
Design, Procurement, Fabrication, Supply,
Installation, Testing and Commissioning.