Qassim University

Qassim University Qassim University Qassim University

Apart from the supplied water treatment plant & pump sta – tion. The sewage treatment plant of average capacity equals to 5250 m3/d & can be extended to a maximum capacity up to 13125 m3/d. It consists mainly of two treatment streams, each stream of 2625 m3/d capacity; using a very convenient treatment method called RBC (Rotating Biological Contractors).

The wastewater treatment plant is designed to treat the wastewater that coming from the different facilities inside the university. Suspended solids and biodegradable organic matter are reduced through the treatment system to the acceptable limit for irrigation.